Wienerberger UK

OSG Architecture was appointed to provide comprehensive technical design, coordination, and construction phase consultancy to deliver a new state-of-the-art tile manufacturing facility for Wienerberger UK. The new facility will span 7,500m².

Bottom Right
Services Mobile Image

overview

Building on an existing relationship with the Design and Build Contractor, Toureen Contractors, OSG Architecture was appointed to provide comprehensive technical design, co-ordination, and construction phase consultancy to deliver a new tile manufacturing facility for Wienerberger UK. The new facility will span 7,500m².

The project commenced on site in January 2024 and is set for completion within the year.

Project Details

  • Project Name

  • Wienerberger UK
  • Location

  • Sittingbourne
  • Client

  • Toureen Contractors Ltd
  • Project Value

  • £10.5 Million
  • Completion details

  • On site
  • Project Team

  • Contractor: Toureen Contractors Ltd

    Structural & Civil Engineer: Elliott Wood

    RIBA Stages: 4-7

challenges and solutions

The project faced significant timeframe constraints, with construction starting in January 2024, coinciding with the commencement of RIBA Stage 4 technical design. OSG managed this by utilising a detailed REVIT model for spatial coordination and effectively resourcing a skilled team specialising in industrial building types. Additionally, OSG integrated information from the end-user’s specialist machinery suppliers into the building model to ensure proper alignment with the layout and detailing.

sustainable elements

To maximise power generation, the building's extensive roof area will be covered with photovoltaic panels. A siphonic drainage system will capture and store rainwater for reuse in the manufacturing process, enhancing the facility's sustainability.

construction methods

The building is constructed using a portal steel frame system, combined with in-situ cast footings and floors. Lightweight cladding sheets are used for the upper portions of the building envelope, providing an efficient structural solution.

enhancing compliance and efficiency

OSG added value by re-designing various project elements during the technical phase, ensuring compliance with regulatory requirements and improving efficiency. Acting as the lead consultant, OSG managed program timescales and seamlessly incorporated redesigns into the service delivery.

summary

This large-scale industrial project required the integration of specialised machinery and adherence to a fast-paced schedule. OSG successfully managed detailed coordination, quick information turnaround, and led the design team, ensuring the project met all technical and regulatory standards efficiently.